Monday, 29. May 2017 You are not logged in... [Log In]
 

Mr. Benjamin Etanuwvoma

Mr.  Benjamin Etanuwvoma

Aminton Integrated Services Ltd

NG - 5001 Port Harcourt

1359 visitors
Fluency:  
Main focus:An IRCA registered QMS Auditor, PECB ISO 9001 Implementer, EXEMPLAR GLOBAL Environmental Management System Auditor & holds a CSWIP 3.1 certification in welding inspection.
I have used ISO 9001:2008 Standard, SHELL DEP&SCS, TOTAL General Specification and other Industry Standards & Codes such as API 1104, ASME B31.3, ASME 31.9, ASME IX & AWS DI.I.
Am proficient in Ms. Word, Ms Excel Packages.


BEST PRACTICE

Waste-to-Energy (WtE) facility

Renergia, a brand new Waste-to-Energy (WtE) facility opened in Canton Lucerne, shows that Waste-to-Energy can provide reliable heat for industries.

Category: Incineration / Waste-to-Energy plant
Executing firm: Renergia Zentralschweiz AG

MBT Ljubljana, Slovenia

In Slovenia arises one of the largest and most modern waste treatment plants in Europe.

Category: Recycling / MBT
Executing firm: STRABAG AG

Flue Gas Cleaning

The final unit of the incineration plant is one of the most important parts as it has the objective of cleaning the air pollutants produced.

Category: Incineration
Executing firm: ete.a - Ingenieurgesellschaft für Energie– und Umweltengineering & Beratung mbH

Batch Dry Fermentation

The biogas produced from the waste can be converted in a CHP to electrical and thermal energy or fed as processed bio-methane into the natural gas grid or used as fuel (CNG).

Category: Recycling / Fermentation
Executing firm: BEKON Energy Technologies Co. & KG

MBT Warsaw, Poland

The Bio-Dry™ system is a static, aerated and flexibly enclosed reactor for the biological drying of various solid waste matters containing some biodegradable contents.

Category: Recycling / MBT
Executing firm: Convaero GmbH

 
  Advertise with us | Sitemap | Contact | Legal © 2009, WtERT GmbH